Front loading cargo bike,Electric school bus |
Front loading cargo bike,Electric school bus
You can put your kids/pets/belongings in the front,making sure their safety.
Product Description |
Front loading cargo bike,Electric school bus
Features:
Front loading cargo bike,Electric school bus
-Provide electric system,more ease to riding and delivering the heavy cargo.
-With TEKTRO Hydraulic Disc brake
-Suitable for 2 or 4 kids
-Three wheel more stabilize,just have fun with your family!
Specification |
Product Name | Front loading cargo bike |
Gear | SHIMANO Nexus 7 Speeds |
Wheel size | 24inch(front), 26inch(rear) |
Brake | Front: Hydraulic Disc brake, Rear:Coaster brake |
Chainwheel&crank | Alloy(PROWHEEL) |
Tyre | With reflector line(KENDA) |
Rim | Double wall aluminum alloy(Stars) |
Saddle | Leather saddle |
Damper | Yes |
Number of Children | 2-4toddlers |
Color of box | White/Natural wood color/Black |
Dimensions | Box: 1010*620*550mm, Bike2230*860*1200mm |
Loading weight | 150KGS |
Net weight | 65KGS |
Pictures |
Front loading cargo bike
Certification |
Packing details |
This item is shipped 50% assembled into 2 cartons
Assembly time is approximately 3-4 hours
Outer packing size: Front box:875*255*1025mm,Rear box:1750*215*735mm
For Sample Order: we will suggest add plywood case to protect the products.
Delivery,shipping & Serving |
Lead time: 60 days for bulk order.
Shipping: Bulk order, by sea.
Sample by sea or by express
Weight: N.W:67Kgs, G.W:72.5Kgs
Our service |
1. Warranty:
Bike frame:3 years
Electric system:18 month
2. We provide customized service,let us know your requirement of the bike,well-trained engineers will offer you any technical support.
3. We will reply your inquiry within 24h.
FAQ |
1.Are your company a trading one or a factory?
Factory + trade (mainly factories, so the quality can be ensured and price competitive)
2.How long have your company run on cargo bikes?
We established in 1989s,do cargo bike export since 2003s.
3.Which payment terms are you accept?
Payment Terms: T/T, bank transfer, or cash
4.After an order is placed, when to deliver?
it will be decided by the time of the factory production and your quantity.Normally around 45-60 days.
5.If the products are not conformity with requirements, how to solve?
If the products are not conform to customer samples or have quality problems, our company will be responsible for it.
6.What about the cooperation process?
Confirm details of order, 30% deposit, Arrange production, pay the balance, shipment.
Thanks You. Have A Nice Day.